5
Position the chosen cladding, paying particular
attention to the maximum level mark.
7
Apply soapy water if is necessary.
2 and 3 ways
6
Cut the Porex flush to the cladding and seal the
perimeter, if necessary. Another option is to
completely remove the exterior part of the Porex.
8
Position the plate chosen according to the
model and secure it with adhesive tape.
15