Requirements | Assembly instructions | Care information
•
Observe the local building regulations and the snow load zones in your region.
•
Before the assembly sort the parts and check the contents list according to the assembly instructions.
•
At least 2 persons are required to assemble the terrace roof.
•
Follow the instructions and installation steps in the assembly instructions.
•
The Twin-Wall Sheets do not walk on transverse running boards (at least 2 rafters).
•
Point loads must be avoided absolutely
•
Regularly remove snow from the roof
•
Snow load: models with 3 m roof depth: 200 kg/m² and models with 4 m roof depth: 150 kg/m²
•
Included fixing material is only for solid masonry. Separate fixing materials must be used for insulation, hollow
blocks, etc.
•
Keep the gutter free of leaves, dirt and snow.
The terrace roof must be installed on a flat, solid surface (for example concrete, concrete slabs). Foundation di-
•
mensions: length 40cm x width 40cm x depth 80cm
•
Clean the Twin-Wall Sheets with water and a mild detergent and do not use abrasives, acetone or solvents!
•
Defective or bent posts or beams must be replaced immediately.
•
The wall connection profile must be installed at the following height (measured at the upper edge of the
profile)
3m depth: 240cm = 7° - 300cm = 20°
4m depth: 240cm = 5° - 340cm = 20°
•
As the cross beam can be moved by max. 60cm towards the house wall, this results in a higher roof pitch (slope).
Colour and size deviations etc. within the usual tolerances reserved. Our recommendations do not release the custo-
mer from the obligation to check the product on his own responsibility. In case of doubt, please consult a specialist.
Technical modifications reserved
4 und 5
13, 17, 19
17
TX 25
GB
3