Pfister 0T8 Manuel D'installation page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9
9A
9D
9A
9 PRESSURE TESTING VALVE
Use two iron pipe plugs (9A) (not included) on both Shower Outlet (9B) and
Tub Outlet (9C). Remove Plasterguard (9D) from Valve Body (9E). Perform
pressure test. Look for leaks from the outlets.
WARNING: Pressure testing is not to exceed 250 PSI. Make sure
pressure is balanced between hot and cold inlets.
WARNING: Differential pressure of hot and cold inlets must not exceed
100 PSI.
CAUTION: Slowly remove pipe plugs (9A) from tub and shower outlets
to relieve pressure.
10 UNIT START UP
Turn on water supplies, and check all connections for leaks.
11
11B
11A
11 FLUSHING FOR TUB AND SHOWER COMBINATIONS
Turn on water supply lines allowing water to flow from tub spout outlet (11A)
until all foreign matter has cleared the line. Water should not be flowing from
shower outlet (11B) during this test.
9B
9E
9C
ENGLISH
12
12B
12 FLUSHING FOR SHOWER ONLY INSTALLATION
Be sure to plug Bottom Outlet with Pipe Cap or Plug (12A) using Thread Sealant.
Turn on water supply lines allowing water to flow from shower outlet (12B) until
all foreign matter has cleared the line.
13
1 1/4" Dia
13A
13C
1 1/2" Dia
13 FINISH WALL PREPARATION
Replace plasterguard (13A) onto Cartridge (13B) and secure with Screw (13C).
Make appropriate holes to finished wall. Pfister recommends that all Tub
Spout holes be 1 1 / 2 " diameter and Shower Outlet holes be 1 1 / 4 " diameter.
CAUTION: Make sure that leak tests and flushing are performed before
preparing the finished wall.
4
12A
13B

Publicité

Table des Matières
loading

Table des Matières