Castel XELLIP Serie Fiche Technique page 11

Masquer les pouces Voir aussi pour XELLIP Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

XELLIP MONITOR
INSTALLATION
Wall installation:
Installation height from the finished floor: 1,23m between trait finite level and floor.
1 - Attach the mounting box as
shown in the picture below
4 - Remove the cover
7 - Rotate to the left to hear the
closing clip
Desk support installation:
Datasheet n° 604-0032G
2 - Screw the base to the mounting
box
5 - Connect the RJ45 cable
8 - The monitor is installed
Screw for mounting the base on the frame
www.castel.fr
3 - Make it level
6 - Tilt the monitor and snap with
the notches on the base
9 - To remove the monitor, insert a
flat screwdriver to reverse rotation
FR
EN
Page 11 / 16

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

500.8000500.8100500.8200

Table des Matières