All manuals and user guides at all-guides.com
METAL DUCTWORK INSTALLATION
1 . Locate suitable area
of duct for installation .
ALTERNATE CUTTING METHOD
a . Using the mounting plate, mark 4
Cutting Method holes on duct .
6 . Center openings and press
5 . Remove backing
from mounting plate
adhesive gasket .
9 . Secure the unit to the
mounting plate with (4)
thumb nuts .
NOTE:
Unit requires continuous power . Do not install where power to the unit will be cycled on and off .
2 . Cut away insulation
to expose metal duct
(if needed) .
b . Drill 4 holes where marked .
mounting plate onto duct .
The adhesive gasket will
hold the mounting plate
in place .
10 . Power Connection Requirements: This device is designed to operate using a 24 VAC,
40Va transformer . Transformers supplied with a straight cooling or HVAC system may be
used to power the device but must be verified it's capable of handling the additional
device load prior to installation . If the system transformer is not capable of handing
the extra load, a separate 24 VAC, 40Va transformer MUST be used . Do not connect the
device to any power source with a voltage less than 22 VAC and a maximum of 32 VAC .
Doing so will cause damage to the device .
3 . Mark location for 3 . 5 "
opening using the
mounting plate .
c . Cut between holes using tin
1/4
7 . Secure the mounting
plate using (8) #8 self-
tapping screws .
4 . Cut hole in duct using
3 . 5 " hole saw .
snips .
8 . Insert unit into opening .
Be sure the air will pass
though the ActivePure®
Cell honeycomb matrix .
5