Télécharger Imprimer la page

Krick Antje Notice De Construction page 36

Cotre

Publicité

Les langues disponibles

Les langues disponibles

2.16
Fig. coaming stern
Now the stem is made.
2.7
2.8
Fig. parts for stem
Glue parts 2.7 and 2.8 together and fit them into
the hull.
Fig. Stem finished
Glue in the stem and the handrails 1.27.
1.27
Fig. stem and handrails glued in
Stand Mai 2019
2.15
2.8
Seite 8
Now would be the appropriate time to paint the
hull. Mask the deck accordingly and paint the bul-
wark inside up to the deck and the hull outside.
The bulwark, or entrenchment, is a complete or
partially built continuation of the ship's side above
the upper deck of a ship.
The location of the waterline can be seen on the
attached construction plan.
To complete the hull the bulwark supports should
now be installed. It is best to paint the bulwark
supports 2.9 in the laser plate.
Now fit the bulwark supports to the hull and glue
them in place. For the bulwark support, glue 2
supports together in the middle of the tail.
Glue the supports to the bulwark at a distance of
47 mm. Make sure that the bollards part 2.10 are
also positioned on the bulwark. Do not place any
bulwark supports in the area of the net gallows.
Stage 3 Superstructure, Companionway, Hatch
Cover, Parts 3.1 to 3.62
Build the base for the wheelhouse and the winch
from parts 3.1 to 3.3.
3.1
Fig. base parts
Glue the parts 3.2 laterally to the base plate 3.1.
3.1
Fig. side part and base plate
Glue in cross bar part 3.3.
©
Krick Modelltechnik Knittlingen
3.2
3.3
3.2

Publicité

loading

Ce manuel est également adapté pour:

Ro1110