Plan The Installation - Uberhaus 01385000 Guide De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION
Use an on/off switch to operate this fan. See "Connect Wiring" for details.

PLAN THE INSTALLATION

1. Do not use in a cooking area.
2. Two ways to connect ductwork to a factory-shipped unit.
INSULATION*
(Place around and
over Fan Housing.)
FAN
POWER
HOUSING
CABLE*
Seal gaps
around
Housing.
ROUND
DUCT*
Seal duct
*
Purchase
joints with
separately
tape.
TYPES OF TYPICAL INSTALLATIONS
1. Housing mounted to I-joists (Start at "ASSEMBLY INSTRUCTIONS 1")
2. Housing mounted to joists (Start at "ASSEMBLY INSTRUCTIONS 1" )
3. Housing mounted to truss (Start at step "ASSEMBLY INSTRUCTIONS 2")
ASSEMBLY INSTRUCTIONS
1. MOUNT HOUSING TO JOIST OR I-JOIST.
Hold the housing so that it is in contact with the bottom of the joist.
Attach the housing with four (4) screws to the joist through the holes in
each mounting flange.
2. MOUNT WITH HANGER BARS
2a. Sliding hanger bars have been provided, which allow the housing to
be positioned accurately anywhere between the framing. The bars span
up to 24 in. and can be used on all types of framing: I-joist, standard
joist, and truss construction. Slide hanger bars onto housing and
adjust as needed to fit between framing.
ROOF CAP*
(with built-in
damper)
Keep duct
runs short
WALL CAP*
(with built-in
ROUND
damper)
ELBOW(S) *
2
HANGER
BAR

Publicité

Table des Matières
loading

Table des Matières