Télécharger Imprimer la page

Thomas & Betts STX Serie Mode D'emploi page 2

Publicité

Les langues disponibles

Les langues disponibles

SECTION 1: PREPARATION FOR POWER CABLES
1. Determine the working length (the
length of conductors required inside the
enclosure or device). Remove a portion
of the outer jacket to expose the armor,
cut armor using a hacksaw (Figure 1).
CAUTION: Do not nick or cut the
conductor insulation.
2. Trim the outer jacket to adjust the
exposed armor strip length as indicated
in the table (Figure 2).
3. Feed cable through gland nut opening
and push until cable armor hits end stop
(Figure 3).
4. Tighten gland nut to bottom or to
torque value as listed in table (Figure 4).
5.Disassemble hub from body sub-assem-
bly by loosening union. Unscrew sealing
chamber from body sub-assembly.
(Figure 5).
6. Trim inner jacket (to length of 1/8"-3/8")
and expose conductor bundle (Figure 6).
SECTION 2: PREPARATION FOR SHIELDED DATA CABLES
1. Determine the working length (the
length of conductors required inside the
enclosure or device). Remove a portion
of the outer jacket to expose the armor,
cut armor using a hacksaw (Figure 1).
CAUTION: Do not nick or cut the
conductor insulation.
2. Trim the outer jacket to adjust the
exposed armor strip length as indicated
in the table (Figure 2).
3. Feed cable through gland nut opening
and push until cable armor hits end stop
(Figure 3).
4. Tighten gland nut to bottom or to
torque value as listed in table (Figure 4).
5.Disassemble hub from body sub-assem-
bly by loosening union. Unscrew sealing
chamber from body sub-assembly.
(Figure 5).
6. Trim inner jacket (to length of 1/8"-3/8")
and expose conductor bundle (Figure 6).
Figure 1
Figure 3
Figure 5
Figure 1
Figure 3
Figure 5
Figure 2
Figure 4
Figure 6
Figure 2
Figure 4
Figure 6
Page 2 of 4

Publicité

loading

Ce manuel est également adapté pour:

Stx300-479 serieStx350-480 serieStx350-481 serieStx400-482 serieStx400-483 serieStx400-484 serie ... Afficher tout