Napier 84000 Mode D'emploi page 4

Masquer les pouces Voir aussi pour 84000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SETTING UP THE SCREEN ROOM
9) Slide the short fiberglass pole through the sleeve located
at the top of the screen room. Insert either end into the
stared (small) end of the pole joint attached to the top
corner of the screen room.
10)
Insert the steel pole into the pole joint located at the top
of the screen room. Insert the opposite end into the
pin located on the corner of the tent (where the tent
pole is located). Repeat on opposite side of screen
room.
11) Stake the screen room and tent to the ground through
the corner pins and webbing loops.
© 2011 Napier Enterprises – All Rights Reserved.
Rev. 00 11.10.10
SETTING UP THE RAIN FLY & AWNING
12) Drap the rain fly over the tent. The rain fly side that
says "Vehicle Side" goes towards the vehicle. Hook the
rain fly to the bottom rings on the tent. Hook the Velcro
tab around the pole.
13) Stake out the cyclone venting system and the rain fly guide
ropes to the ground.
14) Assemble awning poles (2) by unfolding each section. Place
the pointed end of the pole through the grommet at the
corner of the awning. Insert the ring on the guide rope
around the point and place the awning cap over the guide
rope. Stake the other end to the ground. Adjust length of
guide rope. Repeat on other side.
4 of 10

Publicité

Table des Matières
loading

Table des Matières