EUROPEAN FINISHING EQUIPMENT EVG 24 Serie Instructions D'utilisation Et De Sécurité page 4

Mini chaudière avec fer à repasser
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

A. PREPARING TO IRON
1. Take boiler out of the box.
2. Place boiler on a sturdy work surface.
3. Insert cord supporter (Fig. 1) into the hole provided at the back of the boiler. Insert iron cord
and hose into hook on top of cord supporter.
4. For Model EVG-242, be sure the grey plug for iron is inserted to the grey receptacle (Fig. 1,).
Be sure the black rubber steam hose is connected to the solenoid (Fig. 1).
5. Open Safety Water Cap (Fig. 2) by pushing down and turning counter-clockwise.
6. Fill the boiler with water to the desired level (up to 77 oz). Do not over-fill.
Note: Do not use distilled water.
CABLE SUPPORT
HOLDER
OPERATING INSTRUCTIONS
HOOK FOR CABLE
SUPPORT
CABLE SUPPORT
SAFETY VALVE PLUG
ELECTRIC WIRE
IRON REST
4
HANDLE
Fig. 1
CABLE
IRON

Publicité

Table des Matières
loading

Table des Matières