Base Installation; Door Handle Installation - Aria QL029 Manuel De L'utilisateur

Tout-en-un évier utilitaire, armoire de rangement et robinet
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation (continued)

BASE INSTALLATION

A thorough inspection must be made before installation and any
damages or missing parts must be promptly reported . Do not proceed
with the installation . Do not dispose of packaging before you are
satisfied with your new utility sink.
1 . Unpack the unit and place the sink (B) on a blanket or cardboard
to protect the surface .
2 . Turn the cabinet (A) upside down onto the protective surface .
3 . Gently attach the cabinet base (G) onto its proper location . Using
the supplied base screws (J), attach the base to the cabinet .
4 . Attach cabinet feet (K) to the base .
5 . Gently place the cabinet upright .

DOOR HANDLE INSTALLATION

1 . Insert the door hand screws (H) into the pre-drilled holes on
each door .
2 . Attach the door handles (F) and hand tighten the door handle
screws (H) .
3 . Repeat on other door .
QL029
All manuals and user guides at all-guides.com
8
8
CAUTION:
Do not place side load onto feet when righting
the cabinet .
This panel should
be front panel
A
F
H
J
G
K

Publicité

Table des Matières
loading

Table des Matières