PARTS
1.
Door rack
2.
Control
3.
Freezer drawers
4.
Levelling feet
INSTALLATION
·
Remove the exterior and interior packing, wipe the outside thoroughly with a soft dry cloth and the
inside with a wet, lukewarm cloth.
·
Avoid direct sunlight and heat. Direct sunlight may affect the acrylic coating. Heat sources nearby will
cause higher electricity consumption.
·
Avoid very moist places.
·
Before connecting your refrigerator to the power supply, check that the voltage stated on the rating
label of your appliance corresponds to the voltage in your home. A different voltage could damage the
appliance.
·
Make sure that the air can circulate around the refrigerator.
·
For uneven surfaces, front feet can be aligned.
·
Allow the appliance to stand for 2 hours before turning it on. This allows the cooling agent to settle.
·
After installation, leave the freezer for 12 hours before turning it on. This way the refrigerant can
16
settle.
32
Domo CR010
All manuals and user guides at all-guides.com
1
2
3
4