bora PL 540 Notice De Montage Et D'utilisation page 19

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
Installation of the control box
Use the delivered drill template to carry out the panel
bore on the control box. Position the drill template in
the centre of the extractor unit, mark the drill hole
positions and drill the hole for the control box.
Establish the electrical connection in the floor unit
before the control box is installed and fitted.
All manuals and user guides at all-guides.com
Use the accompanying compensation plates to
achieve a total panel thickness of 36 mm, i.e. panel
thickness and compensation plates taken together are
36 mm thick. The total thickness of 36 mm must be
adhered to in order to ensure proper functioning of the
control box.
compensation plates have to be used with which panel
thicknesses:
19
The following table shows
GB
which

Publicité

Table des Matières
loading

Table des Matières