IS-3_AS
3" & 3X3" Commercial Shallow Frame
Instructions for grid ceiling applications
Step 1
Rotate hinged bar ends to position shown (Fig. D & F) and fully
extend bars. Crimp bottom edge of channel to prevent
rotation of hinged bar ends (Fig. E).
Step 2
Position notched area of mounting bars onto T-bar and lock
by bending tab underneath T-bar bead as shown (Fig. F).
Step 3
Adjust luminaire to desired position along mounting bar and
lock in place using locking screw.
Step 4
Wire in per instructions below
Instructions for all applications
Wire In:
Wire to supply leads. White wire to neutral supply lead, black wire to hot supply lead,
and bare copper and/or green wire must be connected to supply ground. Use wire
nuts (local hardware item). Place all electrical connections in the j-box and close the j-
box door. For luminaires with 0-10V dimming, or digital dimming, wire purple & gray
leads to appropriate control wires.
Ensure luminaire light engine connectors are accessible from aperture opening (Fig G.)
Square Frames:
Adjustment of the position can be accomplished by loosening the wing nut clamp and
rotating the inner square of the frame. Re-tighten the wing nut clamp when
appropriately positioned (Fig. H)
Airseal (Optional):
Install a bead of silicone caulking between ceiling opening and frame. Frames are
tested in accordance with ASTM E283(max 2 cubic feet per minute@ 75 Pa) and
comply with WESC & MEC when installed as instructed.
Junction Box Access:
Remove Fixture & disconnect the connector on Light Engine assembly. Remove wing
nuts that secure internal j-box door and bring the door & cable assembly through
opening in ceiling. (Fig. I) To reinstall door use the reverse of previous step.
7/31/2019
page
2
www.lightolier.com
Downlighting
Fig. D
Fig. E
Fig. H
Fig. F
Fig. G
Fig. I