Page EN-6
Assembly
Assembly
Before getting started:
• Read the chapter "Safety" from
page EN-2.
• Unpack the product as described in chap-
ter "Check the delivery" on page EN-5.
Determine the installation
height
1. Measure the height from floor to ceiling
to determine the installation height of the
awning. The installation height can be ad-
justed between 192 and 312 cm (Fig. 3).
Awning canopy
1. Insert the Keder cord (15) into the upper
seam of the awning canopy (20). (Fig. 4).
2. Unscrew the screws (21) and (22) from
the downpipe elements (11) and (13) and
store them carefully (Fig. 5).
3. Screw the downpipe elements (11), (12)
and (13) together (Fig. 6).
4. Insert the connected downpipe (24) into
the lower seam of the awning canopy (23)
(Fig. 7).
Canopy
1. Insert the connector (5) into the left can-
opy pole element (1), until the first two
holes on the connector and the holes on
the canopy pole element are in line with
each other (Fig. 8).
2. Screw the two ST3.9×15 screws (16)
through the holes provided to fix the con-
nector (Fig. 8).
3. Insert the connector (5) into the right
canopy pole element (4), until the two
holes on the connector and on the canopy
pole element are in line with each other
(Fig. 9).
4. Screw the two ST3.9×15 screws (16)
through the holes provided to fix the con-
nector (Fig. 9).
5. To stretch the awning canopy over the
canopy pole, insert the upper seam of
the awning canopy (20) with the inserted
Keder cord (15) first into the groove (25)
on the left canopy pole element (1) and
then into the groove of the middle canopy
pole element (3) and of the right canopy
pole element (4) (Fig. 10).
6. Insert the canopy pole connector (5)
screwed into the left canopy pole ele-
ment (1) into the canopy pole element
(3) and screw the two ST3.9×15 (16)
screws through the holes provided to fix
the connector. Make sure that the upper
seam of the awning canopy remains taut
(Fig. 10).
7. Insert the connector (5) screwed into the
right canopy pole element (4) into the
canopy pole element (3) and screw the
two ST3.9×15 (16) screws through the
holes provided to fix the connector. Make
sure that the upper seam of the awning
canopy remains taut (Fig. 11).
The canopy pole (26) is now assembled.
Awning frame
CAUTION
Risk of injury!
The extensions can move and may
swing uncontrollably.
■ Hold on to the extensions while as-
sembling the awning frame.
1. Push the extension pole (6) through the
left and right plastic clamps (27) on the
canopy pole (26). Make sure that the
hand crank (2) hangs down or is parallel
to the extension pole (Fig. 12).
2. Put the ceiling brackets (19) on top of the
extension poles (6) (Fig. 13).
3. Screw the fixing rings (28) of the ex-
tensions (8) temporarily to the feet (7)
and (10) (Fig. 14).