GCE AFNOR Notice D'instructions page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MOUNTING THE BASE VALVE :
Mount the spring, the valve and its gasket;
Screw on the seat of the base valve.
MOUNTING THE COVER ASSEMBLY :
Mount the cover assembly onto the plastic housing;
Fix the assembly by screwing the brass tightening nut onto the base
using the multifunction key;
Tighten to a moderate degree.
MOUNTING THE SOCKET HEAD :
Unscrew the valve-fi lter unit before fastening the socket head;
Fix the socket head in position by screwing the chromium-plated nut
onto the base using the multifunction key; (manual tightening of + ¼ turn
with the key).
Re-fasten the valve-fi lter unit.
6.2.3. SIDE INLET PROTRUDING MODEL
MOUNTING OF THE BODY OF THE SOCKET :
Fix the base to the wall by the horizontally
positioned clamp using 2 screws.
SOLDERING THE PIPING :
The base being equipped with a copper
tube 8×10 mm, it is possible to solder the
socket to the piping without disassembling
the base valve;
It is important to protect the valve by
surrounding the copper tubes and base
with a damp cloth during the soldering operation.
MOUNTING THE PLASTIC HOUSING AND THE COVER ASSEMBLY :
Fit the plastic housing onto the clamp after having punched through the
opening intended for the passage of the supply pipe;
MOUNT THE COVER ASSEMBLY ONTO THE PLASTIC HOUSING;
Fix the whole by screwing the brass tightening nut onto the base using
the multifunction key;
Tighten to a moderate degree.
MOUNTING THE SOCKET HEAD :
Unscrew the valve-fi lter unit before fastening the socket head;
Fix the socket head in position by screwing the chromium-plated nut
onto the base using the multifunction key; (manual tightening of + ¼ turn
with the key).
Re-fasten the valve-fi lter unit;
Position the reception cap.
7/40
EN

Publicité

Table des Matières
loading

Table des Matières