Handle Bar Installation - Chapin 97902 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FRAME LEG INSTALLATION
1 1
Attach frame leg (C-8 and C-9) with nuts and bolts (H-1) to tank assembly (C-2). Install end caps (H-12) into frame legs (C-8 and C-9).
C-8
H-12
H-12
H-1
H-1
H-1
H-1
C-4

HANDLE BAR INSTALLATION

1 2
Run on/off switch wiring harness (C-4) through handle bar tubing (C-5).
Bolt handle bar to assembled frame legs using H-1 nuts and bolts.
C-9
C-4
6E
H-1
H-1
H-1
H-1
C-5
H-1
H-1
H-1
H-1

Publicité

Table des Matières
loading

Table des Matières