Cam Lock Assembly; Unfold The Middle Handle; Install The Upper Handle; Install The Chute-Rotation Box - GreenWorks Pro SNC406 Manuel D'opérateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
7.2

CAM LOCK ASSEMBLY

Do not tighten the knob until the cam lock is in place.
1. Remove the knob (16) and spacer (31) from the cam lock
(32).
2. Insert the bolt (17) through the lower handle housing.
3. Slide the spacer (31) over the bolt (17).
4. Screw on the knob (16).
5. Fold the cam lock (32) to lock the handle into place.
7.3

UNFOLD THE MIDDLE HANDLE

1. Loosen the knobs (16).
2. Unfold the middle handle (15) until they come to a stop.
3. Close the quick-release levers (12).
4. Tighten the knobs (16) to hold the middle handle (15) in
position.
NOTE
English
7.4

INSTALL THE UPPER HANDLE

1. Align the holes in the middle handle (15) and the upper
handle (14).
2. Put the bolts (17) through the holes.
3. Tighten the handle knobs (16) onto the bolts (17).
4. Do the same operation on the other side.
7.5
INSTALL THE CHUTE-ROTATION
BOX
23 24
19
1. Align the holes in the panel of the chute-rotation box (23)
and the switch box (24).
2. Put the chute-rotation box screws (18) through the holes.
3. Tighten the chute-rotation box screw nuts (19) with a
wrench (not included).
8
18

Publicité

Table des Matières
loading

Table des Matières