Télécharger Imprimer la page

Troy-Bilt 500 Serie Manuel De L'utilisateur page 7

2 phases et 3 phases

Publicité

Les langues disponibles

Les langues disponibles

6. Attach the two carriage bolts (b) and nuts (a) removed in Step
2. Finish securing the handle by tightening the top two nuts
(c) loosened in Step 2. See Figure 5 or Figure 6 for models with
side supports.
c
b
a
Figure 5
Chute Control Styles
Chute
Chute Control
Assembly
Rod
Side Mounted Chute Rotation Control
w/ Manual Pitch on page 8
Chute Control
(Flex Shaft)
Overhead Chute Control (Flex Shaft) w/ Steel Chute
& 2-Way Pitch Control on page 11
ASSEMBLY
c
a
b
Chute Control
Rod
Overhead Chute Rotation Control
w/ Manual Pitch on page 8
Chute Assembly
b
Refer to Figure 7 below to identify your "Chute Control
Style" and continue to the "Assembly" instructions for
your specific style on pages 8-13.
Chute
Assembly
Assembly
Overhead Chute Rotation Control w/ 4-Way Electric Pitch &
Rotation Control on page 12
Figure 7
7
c
c
a
a
Figure 6
STOP
2-Way & 4-Way
Chute Control
Chute
Control Rod
Overhead Chute Rotation Control
w/ 2-Way Pitch or 4-Way Pitch &
Rotation Control on page 9
Chute
Electric Chute
Control
Chute Control
Rods
b
Chute
Assembly

Publicité

loading

Produits Connexes pour Troy-Bilt 500 Serie