Télécharger Imprimer la page

Husqvarna K1 PACE Manuel D'utilisation page 21

Masquer les pouces Voir aussi pour K1 PACE:

Publicité

Les langues disponibles

Les langues disponibles

To cut in smaller pipes
WARNING:
the kickback zone, it will cause a severe
kickback.
If the pipe is smaller than the maximum cutting depth of
the product, the cutting operation can be done in 1 step
from top to bottom.
Cut the pipe from top to bottom.
To cut in larger pipes
WARNING:
the kickback zone, it will cause a severe
kickback.
If the pipe is larger than the maximum cutting depth of
the product, and can not be rolled, the cutting operation
needs to be divided in 5 steps.
Set the blade guard to pipe cutting mode. Refer to
To set the pipe cutting mode on page 25 .
Divide the pipe into 5 sections. Do a mark of those
sections and of a cutting line. Cut a shallow guide
groove around the pipe.
4
1
Cut those sections in 5 steps with the cutting
directions shown by the arrows in each step.
1598 - 002 - 14.02.2022
If the blade is pinched in
If the blade is pinched in
5
3
2
1
2
3
Make the final separating cut from the top of the
pipe pulling backwards, without involving the upper
quadrant of the blade. Adjust the blade guard to full
forward position for maximum protection.
WARNING:
supported, it should not pinch the blade
when separated in section 5. However
be alert if the blade is pinched during the
final separation. If the blade is pinched
in the lower section, the product may pull
forward away from the operator, rather
then resulting in a rotating kickback.
4
5
If the pipe is properly
21

Publicité

loading

Ce manuel est également adapté pour:

K1 pace rescue