Télécharger Imprimer la page

Presto E-DRY Notice D'installation page 13

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Installation
7. Tape the installation template to the appropriate location on the mounting surface. Drill eight holes at marked
locations.(fig. 1).
8. Remove template and Insert eight (8) plastic anchors (supplied) into drilled holes (fig. 2).
9. Insert eight screws (supplied) to fix backplate into top plastic anchors (fig. 3).
10. Hang the dryer on the base plate (fig. 4).
11. Use Allen key (supplied) to unlock and withdraw filter access drawer. Tighten locking screw through the hole at the
bottom of the dryer. Insert the filter access drawer back into the dryer and lock the security screw. (fig. 5 ).
12. a.Connect hard wired power provided at K.O. location to terminal block behind cover panel (RH-bottom) behind
filter access drawer. Turn on circuit breaker to initiate 'stand by- ready to operate' status.
D. Connect the live wire (Brown) to the terminal block marked "L".
E. Connect the neutral wire (Blue) to the terminal block marked "N".
F. Connect the ground wire to the terminal block marked "
green and yellow tubing. Colors of live and neutral wires depend on voltage of supply service and requirements of
Building and Electrical Code having jurisdiction.
9. b.Energize power supply to initiate 'stand by- ready to operate' status.
10. Replace the filter access drawer, being careful to not over-tighten the security screw.
11. See separate sections for owner options on heater operation and air speed adjustment.
Connections :
" . Bare grounding (earth) wires should be sleeved with
13

Publicité

loading

Produits Connexes pour Presto E-DRY