Secure The Vanity - Robern CRAFT Serie Mode D'emploi

Masquer les pouces Voir aussi pour CRAFT Serie:
Table des Matières

Publicité

SECURE THE VANITY

CAUTION: Risk of product damage. Drill pilot holes into the back rail to provide support and to prevent shifting of the vanity.
1. Mark the locations of the studs on top-most back rail of the vanity.
2. Using a drill bit, drill two pilot holes through the back rail and into the finished wall and stud.
3. Secure the vanity to the wall with two screws* and washers (not provided). Shim as required to keep the vanity level.
4. Reinstall drawers (See page 5).
1
2
* Robern recommends using at least two construction screws to secure the vanity to the wall. Use screws that are long enough to pass
through the vanity back rail, the finished wall, and into the stud. Larger vanities may require more than two screws to secure to the wall.
© 2021 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
Part no. 209-1416 07/21/2021
4
800.877.2376
www.robern.com
Craft Series & Curated Bath Vanity

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Curated bath serie

Table des Matières