Operation
1
Flushing and checking for leaks
IMPORTANT: After installation is completed, turn on the
hot and cold water supplies. Check for leaks.
□
Flush the water lines for one minute. Press the
pin (1) to the bottom position, and ush water
lines for one minute. This ushes away any
debris that could cause damage to internal parts.
Check for leaks.
□
After ushing, turn the handle all the way off to
shut off the water. The pin should now be in its
normal position. Re-tighten any connections if
necessary, but do not overtighten.
Care and Cleaning
□
□
□
Do not use abrasive cleaners when cleaning this faucet.
7
Please contact (800) 880-8164 for further assistance.
1
www.schonsimplymodern.com