Additional parameters for devices with integrated M-Bus
(not add-on modules)
Level
Display
Primary addresses for heat, cold, impulse 1, impulse 2 L4
Commissioning
• Open the ball valves, switch the heating on and open the radiator valve.
• Check the installation for airtightness and direction of flow.
• Seal the temperature sensor and flow sensor to protect it from manipulation.
• Remove the installation cover from the meter housing.
• Note the installation date, the meter numbers, any seal numbers, the old and
new meter statuses.
• Dispose of the used device in accordance with national regulations.
MU2H-0491ge23 R1020
41
EN