Télécharger Imprimer la page

Buderus Logafix BUZ-Plus 15 Notice De Montage Et De Mise En Service page 18

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
English
1.4
Qualification
The pump may only be installed by qualified personnel.
This product may not be commissioned or operated by per-
sons with insufficient accountability (including children) or
who do not possess the relevant specialist knowledge.
Exceptions are only permitted on appropriate instruction
from safety-responsible persons. The electrical connection
may only be established by a qualified electrician.
1.5
Regulations
The current versions of the following regulations must be
observed when installing the equipment:
• Accident prevention regulations
• DVGW worksheet W551 (in Germany)
• VDE 0370/Part 1
• Other local regulations (e.g. IEC, VDE, etc.).
1.6
Conversion, spare parts
The pump must not be technically modified or converted. It
is not permitted to open the pump motor by removing the
plastic lid. Only use original spare parts.
1.7
Transport
Unpack and check the pump and all accessories upon
receipt. Report any damage sustained in transit immedi-
ately.
Dispatch the pump in the original packing only.
1.8
Electrical current
There is a danger of an electric shock when working with
electrical current. Therefore:
12

Publicité

loading

Ce manuel est également adapté pour:

Logafix buz-plus 15 aLogafix buz-plus 15 c