Télécharger Imprimer la page

Hubbell Prescolite LITEISTRY LTR-3SQD Instructions D'installation

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information
and instructions concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials,
and proper lamping. Do not install in areas subject to combustible vapors or gases. Before wiring to power supply and
during servicing or relamping, turn off power at fuse or circuit breaker. All servicing or relamping must be performed by
qualified service personnel. Product must be grounded to avoid potential electric shock or other potential hazard.
Product must be mounted in locations and at heights and in a manner consistent with its intended use, and in
compliance with the National Electrical Code and local codes. The use of accessory equipment not recommended by
the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from
product in whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or
the like to come into contact with the product or to block light from the product, as this may cause an unsafe condition.
INSTALLATION INSTRUCTIONS
LITEISTRY
For LTR-3SQD/SQW-H Fixtures - Top/Above Access Required for servicing Driver
For LTR-4/6SQD/SQW-H-LV/LVE with Emergency option: Top/Above Access Required for servicing Driver
CAUTION: TO REDUCE THE RISK OF ELECTRICAL SHOCK, MAKE CERTAIN THAT THE POWER SUPPLY IS
OFF BEFORE INSTALLING OR SERVICING THIS FIXTURE!
NOTE: For Ceiling thickness & Cutout dimensions refer Table 1 .
Fixture Housing and Hanger Mount
1.
Install the fixture in the ceiling using the two hanger bars (1) (supplied), or mounting channel or bars (by others)
placed in the adjustable mounting brackets (2). Mount the fixture in the ceiling so that the weight of the fixture is
supported by the hanger bars, mounting channel, bar, and/or hanger wires secured to the building structure.
2.
Adjust the fixture so the bottom of the plaster flange opening is flush with the finished ceiling line and in alignment
with adjacent fixtures. Secure mounting brackets by tightening two wing nuts (3) on either side of the fixture.
3.
Determine where the supply wiring conduit will enter the J-Box, remove knockout, and fasten the conduit in
conformance with the National Electric Code.
4.
Remove J-Box cover plate (4). Assemble using appropriate connectors for the supply wire used. Connect ground
wires to green ground lead(s). Connect white (common) to white lead(s). Connect power supply (line) to black
lead(s). Reinstall J-Box cover (4). WARNING: DO NOT pinch wires between J-Box/ballast cover and J-Box.
Consult a qualified electrician for all other options that require other wiring configurations.
5.
Pull electrical cover (5) and power cable down below ceiling through opening in fixture.
For LTR-4/6SQD/SQW Fixtures:
6.
Insert connector (6) into connector (7) and snap firmly together.
7.
Carefully feed wire and connectors (6) & (7) into electrical box (8). Place electrical cover (5) with attached
thumbscrew (10) into position on electrical box. Tighten thumbscrew (10) to secure cover (5) into place.
8.
Squeeze two torsion springs (12) together and insert ends into two brackets (13). Push trim assembly up towards
ceiling until springs draw trim firmly against the ceiling. ( NOTE: For wall wash fixtures, insert the trim so that the
plastic lens faces toward the wall. See illustration on sheet 2.)
4 IN SQ DOWNLIGHT TRIM
6 IN SQ DOWNLIGHT TRIM
701 Millennium Blvd • Greenville, SC 29607
With representatives offices in principal cities throughout North America.
Copyright
2022
, Revision
TM
LTR-3/4/6SQD/SQW
1
A
, All Rights Reserved - Printed in U.S.A.
Part No...........................................
13
4
3
2
6/7
10
5
8
93103420
Page 1 of 8
1
FIXTURE HSG
ASSEMBLY
CEILING
(REFER TABLE 1
FOR CEILING
12
THICKNESS &
CUTOUT)
TRIM
ASSEMBLY

Publicité

loading

Sommaire des Matières pour Hubbell Prescolite LITEISTRY LTR-3SQD

  • Page 1 Part No........... 93103420 Page 1 of 8 IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information and instructions concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials, and proper lamping. Do not install in areas subject to combustible vapors or gases. Before wiring to power supply and during servicing or relamping, turn off power at fuse or circuit breaker.
  • Page 2 Part No........... 93103420 Page 2 of 8 CAUTION: TO REDUCE THE RISK OF ELECTRICAL SHOCK, MAKE CERTAIN THAT THE POWER SUPPLY IS OFF BEFORE INSTALLING OR SERVICING THIS FIXTURE! CORRECT ORIENTATION OF WALL WASH TRIMS LENS CEILING WALL METAL REFLECTOR PANELS Table 1 LIGHT AIMED TOWARD CEILING...
  • Page 3 Part No........... 93103420 Page 3 of 8 CAUTION: TO REDUCE THE RISK OF ELECTRICAL SHOCK, MAKE CERTAIN THAT THE POWER SUPPLY IS OFF BEFORE INSTALLING OR SERVICING THIS FIXTURE! NOTE: For Ceiling thickness and cutout dimensions refer Table 1. For LTR-3SQD/SQW-H Fixtures - Top/Above Access Required for servicing Driver Fixture Housing Mount with Hanger Install the fixture in the ceiling using the two hanger bars (1) (supplied), or mounting channel or bars (by others) placed in the adjustable mounting brackets (2).
  • Page 4 Part No........... 93103420 Page 4 of 8 CAUTION: TO REDUCE THE RISK OF ELECTRICAL SHOCK, MAKE CERTAIN THAT THE POWER SUPPLY IS OFF BEFORE INSTALLING OR SERVICING THIS FIXTURE! LTR-3SQ DL and LWW Remodel Installation This version consists of two main components: the power cable assembly and the trim assembly. The power cable with a J-Box (1+2), the LED Driver attached to a metal electrical box (8+10) at the other, connected with a length of flexible metal conduit (11).
  • Page 5 Nº de la pièce......... 93103420 Page 5 of 8 IMPORTANTES INFORMATIONS SUR LA SÉCURITÉ. LISEZ ET RESPECTEZ TOUTES LES CONSIGNES DE SÉCURITÉ. Lisez les informations et suivez les consignes sur l'étiquette relativement aux emplacements mouillés ou humides, à l'installation à proximité de matériaux combustibles, à l'isolation, aux matériaux de construction et aux ampoules appropriées.
  • Page 6 Nº de la pièce......... 93103420 Page 6 of 8 ATTENTION : POUR RÉDUIRE LE RISQUE DE CHOC ÉLECTRIQUE, VÉRIFIER QUE L’ALIMENTATION ÉLECTRIQUE EST COUPÉE AVANT D’INSTALLER CE LUMINAIRE OU DE TRAVAILLER DESSUS! ORIENTATION CORRECTE DES GARNITURES DE LAVAGE MURAL LENTILLE PLAFOND PANNEAUX RÉFLECTEURS MÉTALLIQUES Table 1...
  • Page 7 Nº de la pièce......... 93103420 Page 7 of 8 ATTENTION : POUR RÉDUIRE LE RISQUE DE CHOC ÉLECTRIQUE, VÉRIFIER QUE L’ALIMENTATION ÉLECTRIQUE EST COUPÉE AVANT D’INSTALLER CE LUMINAIRE OU DE TRAVAILLER DESSUS! REMARQUE : Pour l'épaisseur du plafond et les dimensions de découpe, reportez-vous au tableau 1. Luminaires LTR-3SQD/SQW-H - Accès en haut/en haut requis pour l'entretien du pilote Pose du boîtier de luminaire avec suspente Monter le luminaire dans le plafond à...
  • Page 8 Nº de la pièce......... 93103420 Page 8 of 8 ATTENTION : POUR RÉDUIRE LE RISQUE DE CHOC ÉLECTRIQUE, VÉRIFIER QUE L’ALIMENTATION ÉLECTRIQUE EST COUPÉE AVANT D’INSTALLER CE LUMINAIRE OU DE TRAVAILLER DESSUS! Pose de LTR-3SQ DL et LWW Remodel Cette version comporte deux éléments principaux : l’ensemble câble d’alimentation et l’ensemble garniture. Le câble d’alimentation est raccordé...

Ce manuel est également adapté pour:

Prescolite liteistry ltr-4sqdPrescolite liteistry ltr-6sqdPrescolite liteistry ltr-3sqwPrescolite liteistry ltr-4sqwPrescolite liteistry ltr-6sqw