Model Svb-E8Exp - AIR SYSTEMS INTERNATIONAL SVB-E8 Manuel D'utilisation

Masquer les pouces Voir aussi pour SVB-E8:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GENERAL SETUP & OPERATION, EXPLOSION-PROOF ELECTRIC BLOWER

MODEL SVB-E8EXP

STEP 1)
Place blower in a clean fresh air environment. Set blower a minimum of 5 ft. from the
manhole opening. Note: Inspect blower for damaged or worn parts. Inspect all ducting
and couplings for possible air leaks prior to blower operation.
Air quality of the confined space should be tested prior to ventilation. If air quality of the
confined space is unacceptable, consult a trained professional.
STEP 2)
Install duct cuff to exhaust flange and tighten cinch strap. Keep bends and kinks in ducting
to a minimum to maximize air flow. THE USE OF CONDUCTIVE DUCTING IS REC-
OMMENDED WHEN OPERATING IN POTENTIALLY EXPLOSIVE ENVIRON-
MENTS.
STEP 3)
Explosion-proof models should be fitted with an approved explosion-proof plug to meet Class I, Div. I, Groups C and D,
Class II, Div. I, Groups E, F, G specifications. The plug should not be disconnected or connected in an explosive environ-
ment when the blower is energized.
STEP 4) Switch the explosion-proof "on/off" switch to the "on" position. The unit is now operational.
SHUTDOWN
Insure that all workers are removed from the confined space site.
Shut off blower and remove all ducting.
MAINTENANCE
Keep blower motor dry and free from contaminants and dust.
Check periodically to ensure moving parts are free from obstructions.
-6-
ASSURE THAT THE BLOWER IS PROPERLY
GROUNDED BEFORE OPERATING AND THAT THE
GROUNDING WIRE, IN THE CONDUCTIVE DUCTING
IS ATTACHED TO THE BLOWER AND SADDLE
VENT
If explosive or volatile vapors are suspected or present, follow
ANSI/API procedure 2015 and 2016 for proper grounding of
Grounding lug
the blower. All static electricity must be removed from the
provided for
blower and attached ducting prior to energizing the blower.
ground wire
Conductive ducting should be tested semi-annually to assure
attachment from
conductive duct.
resistance (ohms) does not exceed 300k. If sufficient resistance
is not achieved, the duct should be removed from service.
CAUTION:
®
, IF USED.
CAUTION:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Svb-e8-2Svb-e8ecSvb-e8expSvb-a8Svb-g8Svb-g8p

Table des Matières