Télécharger Imprimer la page

Best CP34 Serie Instructions D'installation page 10

Publicité

Les langues disponibles

Les langues disponibles

14. REINSTALL BLOWER(S) (
A
LL MODELS
Plug the blower(s) in.
15. REINSTALL BOTTOM PANEL
Lift the bottom panel and engage the power pack metal tabs in
bottom panel slots, as shown in details A and B below.
A
HO0112
16. REINSTALL GREASE DRIP RAIL
A. Insert one end of grease rail in power pack side ()
while lifting the other end over the bottom panel
edge ().
B. Center the grease drip rail over the bottom panel
edge and flip it to snap in place.
'
)
CONT
D
HE0085
S
IDE VIEW
B
Secure the bottom panel to the power pack using its screws
previously removed in step 7.
A
HD0292
10
R
ETAINING SCREW LOCATIONS
HO0110
HD0291
B

Publicité

loading

Ce manuel est également adapté pour:

Cp35 serieCp37 serie