Télécharger Imprimer la page

Peerless Industries Paramount PF640 Installation Et Montage page 4

Publicité

Les langues disponibles

Les langues disponibles

Installation to Double Wood Stud Wall
• Installer must verify that the supporting surface will safely support the combined load of the equipment and all at-
tached hardware and components.
• Tighten wood screws so that wall plate is firmly attached, but do not overtighten. Overtightening can damage the
screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud finder is
highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs. Installers
are responsible to provide hardware for other types of mounting situations (not UL approved).
Wall plate (AA) can be mounted to two studs that are 16" (406 mm) apart. Use a stud finder to locate the edges of
1
the studs. Use of an edge-to-edge stud finder is highly recommended. Based on their edges, draw a vertical line
down each stud's center. Place wall plate on wall as a template. The top mounting slots should be 2.5" (64 mm)
above the desired screen center as shown in figure 1.1. Level plate, and mark the center of the four mounting
holes. Make sure that the mounting holes are on the stud centerlines. Drill four 5/32" (4 mm) dia. holes 2.5"
(64 mm) deep. Make sure that the wall plate is level, secure it using four #14 x 2.5" wood screws (CC) as shown in
figure 1.2.
Skip to step 2 on page 6.
STUD
2.5"
(64 mm)
CS
CS = center of screen
WARNING
AA
fig. 1.1
CC
AA
4 of 34
ISSUED: 11-09-07 SHEET #: 202-9251-3 04-30-09
fig. 1.2

Publicité

loading

Ce manuel est également adapté pour:

Paramount pws211/bk