Télécharger Imprimer la page

LUCCI FIJIAN II Serie Manuel page 6

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21
Install the down rod
1. Loose ball joint.
2. Feed down rod through ceiling canopy.
3. Insert the motor wires through down rod, and then secure
ball joint back to down rod.
4. Insert down rod to hanger (see Fig.4), line up hanger
holes with down rod holes and insert bolt. Then insert pin
to end of bolt.
5. Finally secure down rod and hanger by tightening two
screws on the hanger.
6. Lift fan assembly onto mounting bracket. Fig.5.
7. Ensure the notch of the ball joint is positioned
on the stopper of mounting bracket to prevent
fan from rotating when in operation.
Blade attachment
1.
Before Installing the blades, remove the motor screws.
2.
Assemble the blades & holders using the screw set. (Fig. 6)
3.
Secure the blade on the motor by using 2 screws with washers (Fig.7). Once completed, repeat
the process on remaining blades.
HANGING THE FAN
INSTALLING THE FAN
BLADE INSTALLATION
Fig. 6
Fig. 5
6
Fig. 4
Fig. 7

Publicité

loading