RECEIVING AND INSPECTING THE EQUIPMENT
Even though most equipment is shipped crated, care should be taken during unloading so the equipment is not damaged
while being moved into the building.
1. Visually inspect the exterior of the package and skid or container. Any damage should be noted and reported to the
delivering carrier immediately.
2. If damaged, open and inspect the contents with the carrier.
3. In the event that the exterior is not damaged, yet upon opening, there is concealed damage to the equipment, notify the
carrier. Notification should be made verbally as well as in written form.
4. Request an inspection by the shipping company of the damaged equipment. This should be done within 10 days from
receipt of the equipment.
5. Be certain to check the compressor compartment housing and visually inspect the refrigeration package. Be sure lines are
secure and base is still intact.
6. Freight carriers can supply the necessary damage forms upon request.
7. Retain all crating material until an inspection has been made or waived.
INTRODUCTION
This user's manual is intended for installing, using and servicing your Maxx Cold
It is recommended that this manual be kept in an accessible place. Every Maxx Cold machine is designed and
manufactured according to the highest standards of safety and performance. It meets or exceeds the safety standard
of UL 471 and sanitation standard NSF 7.
The Legacy Companies assumes no liability or responsibility of any kind for products manufactured by Maxx Cold, that
have been altered in any way, including the use of any parts and/or other components not specifically approved by The
Legacy Companies. Maxx Cold reserves the right to make design changes and/or improvements at any time.
Specifications and designs are subject to change without notice.
Page 8 of 67
Select Series Reach-In
Refrigerator.