Luff
Foot of the
Tack
Sew the 17 jib hanks part 168 onto the luff at
intervals of 25 mm, starting at the tack.
The distance between the jib hanks is
40 mm.
Also prepare the foresail in the same way.
Finally, complete the topsail.
Updated June 2016
Hea
Lower
Jib
Clew
Page 34
Head
Luff
Tack
First attach one eyelet 215 on each of the 3
corners.
Then place 3 eyelets at intervals of 110 mm on
the luff to attach the topmast (upper part of the
mast).
Now the sail can be attached to the rig.
©
Krick Modelltechnik Knittlingen
Clew
Foot of
the sail