1. GENERAL INFORMATION
1.1 Introduction
This product was manufactured according to rigorous technical safety rules in compliance
with DC standards. The DC declaration and the manual can be downloaded from the
Internet.
Before installing and using this product, carefully read these instructions, which contain
important indications to ensure your safety and that of the users during the installation,
commissioning and servicing of this product.
Once the installation is terminated, store the manual on a place where it is accessible.
The installation of this product (implementation, connections, commissioning, and
maintenance) and all other interventions must be performed by a professional, applying the
recognized rules of good practice, standards and safety regulations in force.
It must conform to the prescriptions related to Electromagnetic Compatibility (EMC) and the
Low Voltage Directive (LVD).
S&P shall not be held responsible for possible injuries and/or damages caused by the non-
compliance with safety instructions or following a modification of the product.
The IDEO 450 Units are designed for dual flow air ventilation and air treatment applications
in public and private buildings:
Indoor installation
Minimum recommended ambient temperature where the unit is installed >10ºC
Working temperature: -25°C / +40°C.
Relative humidity: max 95% non-condensing.
Atmosphere not potentially explosive.
Atmosphere with low salt content, without corrosive chemical agents.
1.2 Acceptance – Storage
In case of missing, non-conforming, or totally or partially damaged delivered products, the
Purchaser must make written reservation on the transporter's receipt and confirm them within
seventy-two (72) hours by sending a recommended letter to the transporter, as well as a
copy to S&P. Acceptance of the unit without any reservation will deprive the purchaser of any
subsequent recourse against us.
The product must be stored in an area protected from bad weather, shocks and stains due to
splashing or splattering of any kind during its transport from the supplier to the end customer
and onto the worksite before installation.
22