Télécharger Imprimer la page

Super Ego SD1000100 Mode D'emploi page 6

Programmateur d'arrosage analogique

Publicité

Les langues disponibles

Les langues disponibles

GB
Instructions for configuration
Technical data
Minimum operating pressure:
0.5 bar (7.25 psi)
Maximum operating pressure:
12 bar (174 psi)
Maximum water temperature:
60ºC (140ºF)
RUN TIME = watering duration
FREQUENCY = watering frequency
HOUR = hour
WEEK = week
ON = connected
OFF = disconnected
A. Installation of the battery
Detach the timer body pulling from
the orange part and install one 9V
ALKALINE battery (Check the position
of +/- poles).
B. Check the manual operation of
the timer
1. Set RUN TIME to OFF position.
2. Set FREQUENCY to RESET position.
3. Set RUN TIME back to ON position.
4. A "CLICK" sound is heard and a
GREEN light flashes briefly.
If all the above steps take place as
described, the timer is free from
fabrication defects and will work
properly.
Programming
Immediate watering
1. VERY IMPORTANT: To program any
watering mode, always start with
the RUN TIME rotary knob in ON and
then set the FREQUENCY rotary knob
to RESET.
2. The red lamp blinks. (If the red lamp
does not blink, turn the FREQUENCY
rotary knob to any position and set it
back to RESET).
3. Set the RUN TIME rotary knob to the
required position (1, 3, 5, 10, 15, 20,
30, 60, 90 or 120 min.) to select the
watering duration.
4. Set the FREQUENCY rotary knob to
the required position (1, 2, 3, 4, 6, 8,
12, 24 (once a day), 48 (once every
other day), 72 hours (once every 3
days) or Week (once a week).
5. Listen to a "CLICK" sound meaning
the timer valve has opened and a
GREEN light flashes to confirm the
selection made.
After these steps, the timer must start
watering during the time set by RUN
TIME and must repeat the irrigation
as per the setting of the FREQUENCY
knob.
ATTENTION: If steps 3 to 4 are not
made while the red light blinks, the
timer will not memorise the previous
steps. Therefore, the watering sequence
must be programmed from step 1 in
paragraph Programming.
VERY IMPORTANT: The first watering
starts just at the time when the first
programming is being made.
6

Publicité

loading