Installation; Mounting; Operation; Cleaning And Maintenance - EuroLite LED Open/Closed Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Mounting

The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
Before rigging make sure that the installation area can hold a minimum point load of 10 times the device's
weight.
Do only use appropriate screws and make sure that the screws are properly connected with the ground.

Operation

Connect the connection cable of the power-unit with the DC IN-socket. Plug the power unit into your outlet.
With the POWER-switch, you can switch the device on and off.
You may now set the desired LED message.

CLEANING AND MAINTENANCE

We recommend a frequent cleaning of the device. Please use a soft lint-free and moistened cloth. Never use
alcohol or solvents!
There are no serviceable parts inside the device except for the lamp. Maintenance and service operations
are only to be carried out by authorized dealers.
Should you need any spare parts, please use genuine parts.
Should you have further questions, please contact your dealer.

TECHNICAL SPECIFICATIONS

Power supply (via enclosed power unit):
Power consumption:
Dimensions (LxHxW):
Weight:
Maximum ambient temperature T
Maximum housing temperature T
Number of LEDs:
Please note: Every information is subject to change without prior notice. 30.08.2006 ©

DANGER TO LIFE!

Disconnect from mains before starting maintenance operation!
:
a
(steady state):
B
12V DC
15 W
460 x 200 x 30 mm
1 kg
45° C
60° C
137
10/19
80500310_V_1_0.DOC

Publicité

Table des Matières
loading

Table des Matières