Ce Marking; Set-Up 4; Checking The Scope Of Delivery; Selecting The Lines - Saunier Duval RED-5 Notice D'installation

Masquer les pouces Voir aussi pour RED-5:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20

3.5 CE marking

The CE marking shows that the products
comply with the basic requirements of the
applicable directives as stated on the de-
claration of conformity.
The declaration of conformity can be
viewed at the manufacturer's site.
4 Set-up

4.1 Checking the scope of delivery

Check that the scope of delivery is com-
plete.
Quant-
Component
ity
1
RED‑5
1
Installation accessories (bolts
and rawl plugs)
1
Documentation

4.2 Selecting the lines

Use standard commercial lines for the
wiring.
Do not use flexible lines for mains
voltage supply lines.
Use insulation cables for mains voltage
supply lines (e.g. NYM 3 x 1.5).
Line cross-section
Supply line for
mains voltage
(pump or mixer
mains cable)
eBUS line (extra-
low voltage)
Sensor line (extra
low voltage)
Line length
Sensor lines
Bus lines
0020257175_03 Installation instructions
≥ 1.5 mm²
≥ 0.75 mm²
≥ 0.75 mm²
≤ 50 m
≤ 125 m

4.3 Removing the front casing

A
Remove the front casing in accordance
with the illustration.

4.4 Installing the wall base

B
B
Install the wall base using the appro-
priate fastening material in accordance
with the illustration.

Set-up 4

C
B
A
33

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

0020257510

Table des Matières