Continental CEFB36H-BS Manuel D'installation Et D'opération page 13

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installation and finishing
EN
8. Remove the 4 screws holding the back retainers in place (Fig. 3-9). Set the screws and retainers aside (Fig.
3-10).
Repeat on
opposite
side.
Fig. 3-9
Fig. 3-10
9. Place the brick panels into the bottom retainers and behind the side retainers (Fig. 3-11).
Side
retainer
Repeat on
opposite
side.
Bottom
retainer
Fig. 3-11
10. Re-install the 2 back retainers by re-installing the 4 screws previously removed in step 8 (Fig. 3-12 and 3-13).
Repeat on
opposite
side.
Fig. 3-12
Fig. 3-13
13
W415-2947 / A / 09.01.20

Publicité

Chapitres

Table des Matières
loading

Table des Matières