Télécharger Imprimer la page

GE UAZEH Instructions D'installation page 7

Pour les ensembles d'element chauffant electrique des appareils de traitement d'air

Publicité

Les langues disponibles

Les langues disponibles

9.
Knock out the appropriate area of the plastic circuit breaker cover on the access panel of the air handler.
10.
Reinstall the front access panel and upper access panel on the air handler.
11.
After the installation is completed, power on and check whether the heater is working.
Troubleshooting:
• If it does not heat up, check and ensure that the circuit breaker is switched in the "ON" position.
• In case that no-heat issue is prevalent, the heater should be replaced.
• During the above checking process, if the circuit breaker keeps getting tripped (the switch tab shifts from on to off
position), a new heater must be ordered.
31-5000503 Rev. 2
Installation Instructions
7

Publicité

loading