Initial operation
7
Initial operation
CAUTION!
To avoid unnecessary contamination the installation of the smoke switch should be undertaken only just
before the initial operation.
In case of early installation there is a risk that the smoke switch is contaminated by construction dust. This
shortens the life of the smoke switch considerably!
7. 1
Remove cover
Fig.: 7.1.1
Remove protective cap (1.).
X
X
Remove cover (2.).
X
X
7.2
Installation and connection of the smoke switch
Fig.: 7.2.1
Clip on smoke switch.
X
X
Fig.: 7.2.2
Plug in 24 V cable of the power pack (1.).
X
X
For additional connections, see the separate document "Instructions for Installation, Commissioning, Operation
X X
and Maintenance of the GEZE Hold-Open Device FA GC".
Clip on cover panel (2.)
X
X
CAUTION!
Do not pinch cable.
X
X
GB 6
RSZ 6