2.3.1 Power connection
Up to 6 can be connected in parallel on the same installation with a limitation of 100A per phase with
the provided SmartMeter.
The AC connector must be connected to the public grid, the battery directly to the battery, and the
back-up to the secured consumers.
2.3.2 Communication connection
FR
EN
IT
IMEON 3.6
IMEON 9.12
Wiring of parallel plate must be done as above.
2.3.3 Smart meter and CAN communication connection
Meter connection
From Smart Meter to T splitter: wire according to the documentation.
From T splitter to inverters: Use straight ethernet cable.
Parallel mounting - Installation Guide IMEON - Rev 3.1
IMEON PARALLEL
14