Cleaning The Spark Arrestor; Valve Clearance; Generator Maintenance; Storage - iPower SUA10000EC Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Cleaning the Spark Arrestor

1. Allow the engine to cool completely before
servicing the spark arrestor.
2. Loosen the screw (A) to be able to remove clamp
(B) and cover plate (C).
3. Remove the spark arrestor screen (D).
4. Carefully remove the carbon deposits from the
spark arrestor screen with a wire brush.
5. Replace the spark arrestor if it is damaged.
6. Position the spark arrestor on the muffler and
attach with the screws removed in step 2.
NOTE:
This product is equipped with a spark arrestor that
has been evaluated by the USDA Forest Service;
however, product users must comply with Federal,
State, and local fire prevention regulations. Check
with appropriate authorities. Contact customer
service or a qualified service center to purchase a
replacement spark arrestor.
D
C
B
A

Valve Clearance

Important: Please contact Authorized Service Center
for service assistance. Proper valve clearance is
essential for prolonging the life of the engine. Check
valve clearance per maintenance schedule.
Valve
0.004~0.006 inch
Clearance
Torque
NOTICE
Checking and adjusting valve clearance must be
done when the engine is cold.

GENERATOR MAINTENANCE

Make certain that the generator is kept clean and
stored properly. Only operate the unit on a flat, level
surface in a clean, dry operating environment.
DO NOT expose the unit to extreme conditions,
excessive dust, dirt, moisture or corrosive vapours.
NOTE:
DO NOT use a garden hose to clean the generator.
Water can enter the generator through the cooling
slots and damage the generator windings.
Use a damp cloth to clean exterior surfaces of the
generator.
Use a soft bristle brush to remove dirt and oil.
Use an air compressor 25 PSI (172 kPa) to clear dirt
and debris from the generator.
Inspect all air vents and cooling slots to ensure that
they are clean and unobstructed.

STORAGE

It is recommended to start and run the generator for
30 minutes, every 30 days. If this is not possible,
refer to below short term and long term storage.
Short Term Storage
Fill the tank with fresh gasoline and add gasoline
stabilizer. Drain the carburetor float bowl.
1 - Add a properly formulated FUEL STABILIZER to
the tank if it is not already added.
2 - Run the engine for 10-15 minutes to circulate
stabilizer throughout fuel system.
3 - Allow the generator to cool a minimum of 30
minutes and then drain the carburetor float bowl.
4 - Clean the generator and store in a cool, dry and
well ventilated area out of direct sunlight.
Page 21
Intake Valve
Exhaust Valve
0.006~0.008 inch
0.1~0.15 mm
0.15~0.2 mm
10-12 N·M
10-12 N·M

Publicité

Table des Matières
loading

Table des Matières