Télécharger Imprimer la page

Moen 5250 Serie Mode D'installation page 10

Publicité

Les langues disponibles

Les langues disponibles

CONNECTING SIDE BODIES TO
DIVERTER VALVE AND WATER SUPPLIES
1. Slide "TEE" onto inlet port and tighten com-
pression nut. NOTE: Check to insure ferrule
and nut are in place fefore installing "TEE" onto
inlet tube. Thread one end of each supply hose
onto a side bodies, the other end is threaded to
the "TEE" connection inlet. Supply hoses can
be crossed or looped for ease of assembly.
SUPPLY HOSE (hot side)
HOT SIDE
SUPPLY STOP
(not supplied)
INSTALLATION OF LIFT
ROD ESCUTCHEON:
1. Thread the mounting tube into the lift rod escutcheon.
Place the rubber washer below the lift rod escutcheon.
2. Insert the mounting tube through the bidet lift rod hole
from above. Place the metal washer on the mounting
tube. Thread the mounting nut onto the mounting tube
and tighten.
3. IInstall the remainder of the waste assemb ly as
shown.
2. Connect supply tube (not supplied) to supply
stop valve and then to inlet port (bottom port) on
side bodies on both hot and cold sides. Tighten
side body and supply stop valve connections.
SUPPLY HOSE (cold side)
COLD SIDE
FLEXIBLE SUPPLY TUBE
(not supplied)
LIFT ROD
ESCUTCHEON
RUBBER
WASHER
MOUNTING
TUBE
METAL
WASHER
MOUNTING
NUT
SUPPLY TUBE
(not supplied)
INLET PORT (long tube)
BIDET "TEE" CONNECTION

Publicité

loading