Télécharger Imprimer la page

Bradley S19-788 Manuel D'installation page 2

Masquer les pouces Voir aussi pour S19-788:

Publicité

Les langues disponibles

Les langues disponibles

S19-788, S19-788LHS
Read this installation manual completely to ensure proper installation, then file it with the
Installation
owner or maintenance department. Compliance and conformity to drain requirements and
other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
Packing List
any packaging material. If any parts are missing, do not begin installation until you obtain
T H
IS
E
S ID
U P
the missing parts.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with
ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
http://www.bradleycorp.com
FAX: (262-251-5817)
114-051
100˚ F
This unit is to be used with tepid, potable water as defined by ANSI Z358.1. (Note: avoid
60˚ F
prolonged exposure to ambient heat sources above 100° F, or below 60° F).
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.
Supplies Required:
• Pipe sealant
• Air pressure equipment or supply (clean and free of oil and contaminants) capable of up to 100 psi.
• Sign-mounting hardware
• Adjustable Wrench
2
netzerotools.com
IMPORTANT
10/19/2012
netzerotools.com
Installation

Publicité

loading

Ce manuel est également adapté pour:

S19-788lhsS19-788h