Télécharger Imprimer la page

Broan 345 Mode D'emploi page 4

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
12. Carefully lift shingles and nail flashing securely to the roof
using broad headed galvanized roofing nails..
13. Nail under shingles at the top two corners and both sides. Nail
flashing directly to the roof in four places on the botttom.
14. Using a good grade of roofing cement material, seal all of the
shingles and heads of nails.
DO NOT SEAL the bottom edge of flashing.
(
)
CONTINUED
WIRING
WARNING: TURN OFF ELECTRICAL HOUSE CURRENT AT
SERVICE ENTRANCE BEFORE WIRING. INSTALLATION WORK
AND ELECTRICAL WIRING MUST BE DONE BY A QUALIFIED
PERSON(S) IN ACCORDANCE WITH ALL APPLICABLE
CODES AND STANDARDS, INCLUDING THE NATIONAL
ELECTRICAL CODE.
1. Remove the thermostat wiring box cover plate. Bring the power
cable at least 6" into the ventilator wiring box. Fasten to box
with appropriate connector.
TO
MOTOR
GROUND TO
SWITCH BOX
MASTER
ON-OFF
SWITCH
BLACK
120 VOLTS
LINE IN
2. For standard installation, connect the two leads in the thermostat
wiring box to the two power leads. Attach ground wire from
the power cable to the GREEN ground screw in the box.
MODEL 345
Page 4
THERMOSTAT
MOTOR
VENTILATOR
WIRING BOX
WHITE
MASTER
ON-OFF
SWITCH

Publicité

loading