MACHINE SETUP
Carefully check carton for signs of damage. Report
damages at once to the carrier.
Unpack the machine and check machine for
completeness according to the packing list.
INSTALLING BATTERIES
Battery installation must be accomplished after
removing the machine from the pallet. Carefully follow
the battery installation diagram below.
1
- -
- -
2
- -
457mm
CABLE
WARNING: Fire Or Explosion Hazard:
Batteries Emit Hydrogen Gas. Keep Sparks And
Open Flame Away. Keep Battery Compartment
Open When Charging.
FOR SAFETY: When servicing machine, wear
protective gloves and eye protection when
handling batteries or battery cables. Avoid contact
with battery acid.
INSTALLING PAD
1. Select a burnishing pad that is designed to
operate over 2000 RPM. The pad should be a
maximum of 25.4 mm (1 inch) thick,
483 mm (19 inch) in diameter with a standard
89 mm (3.5 inch) center hole.
WARNING: Moving Parts. Turn Off Power
Before Working On Machine.
FOR SAFETY: Before leaving or servicing
machine, stop on level surface and turn off
machine.
BR- -2250/BR- -2500 (08- -05)
FRONT
OF
MACHINE
- -
- -
- -
305mm
CABLE
FIG. 1
Home
Find... Go To..
2. Tap the right front side of the pad shroud with your
toe. The head will rise to the pad mounting
position (Figure 2).
3. Remove the plastic centerlock from the pad driver
by turning it clockwise. Position the pad accurately
centered on the pad driver, and screw the
centerlock in place counter-clockwise until it is
tight (Figure 3).
Close
NOTE: This machine is equipped with a pad
centerlock with a left hand thread.
NOTE: Make sure centerlock does not cross thread or
floor damage may occur.
ATTENTION: Do not operate machine without a
pad and centerlock in place.
OPERATION
FIG. 2
Open
FIG. 3
7