Nussbaum POWER LIFT HF 3S 5000 Manuel D'exploitation page 97

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

• After setting up the lift columns, lift the cross-con-
nection to the opposite side and fasten it. The hy-
draulic lines are placed in the cross-connection.
• Guide the lines from above into the riser of the
opposite side and connect to the colour marked
positions.
• Fasten the extension using the long screws (8)
after the tensioning plate (7) has been placed.
7
8
7 Tensioning plate
8 Fastening screws
OPI-POWER LIFT HF 3S 5000 - HYMAX HF 3S 5000-V1.1-DE-EN-FR-ES-IT
8.1.3 First filling
When filling the hydraulic system, identify already
filled cylinders (with the sticker "first filling" on the
system) and unfilled cylinders (no sticker on the sys-
tem).
Lifts with this sticker already have hydraulic oil in the
hydraulic cylinders.
005
First filling with sticker
Required oil volume 9 l (HLP 32).
Lifts with this sticker already have hydraulic oil in the
hydraulic cylinders.
After setting up the electrical connection to the lift,
the hydraulic system can be filled.
9
9 Operating lever
10 Allen key operating lever
11 Oil filling opening
• Loosen and remove the plastic part of the oper-
ating lever (9) of both Allen screws (10).
• Loosen and remove the unit cover.
• Unscrew the oil filling opening (11).
• Fill with 9 L of hydraulic oil (HLP 32).
• Raise the lift approx. 1 m by pushing the operating
lever (9).
• The lift rails can be lifted at different times!
• Hang in the lifting arms and secure them (see
8.2).
• Push the operating lever forwards and raise the lift
to its uppermost end position.
10
11
006
97

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hymax hf 3s 5000Power lift hf 3s 5000 dgHymax hf 3s 5000 dgPower lift hf 3s 5000 universalHymax hf 3s 5000 universal

Table des Matières