Installation
Preparation for extraction mode
1. Push the lock on the grease filters 1a backwards and remove the grease filters
1a carefully downwards.
4
2. Depending on the required installation of the exhaust air hose (top/rear),
install the exhaust air connection 4 and cover 5 in the air discharge apertures
of the extraction hood.
During operation, the air is discharged to the outside through the exhaust air
hose.
Before installation of the hood, wall breakthrough ( core drilling) must be carried
Only for extraction mode
out by a specialist firm. During planning of wall breakthrough, pay attention to
the length of the exhaust air hose. The exhaust air hose must be sufficient up to
the outside edge of the wall without any kinks.
If the exhaust air hose is routed through an external wall, the
Important!
air discharge must be covered on the outside using a cover with
automatically opening slots (not in the scope of delivery). For this,
commission the specialist firm that makes the wall breakthrough.
1a
5
or
5
4
Preparation
11
English