Electrical Wiring Connection - Daikin FTXB09A RXB09A Manuel D'installation

Série split r410a
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

09/12 class
[Method of mounting conduit]
A protection plate is fixed for protection from the high-voltage section.
1)
Dismount the stop valve cover by removing the screw.
2)
Dismount the protection plate by removing the 2 screws.
3)
Dismount the conduit mounting cover by removing the 2 screws.
4)
Pass wires through the conduit and secure them with a lock nut.
5)
After completing the work, reattach the stop valve cover, the conduit mounting cover, and the protection plate to its
original position.
SIG
Shape wires so that
the proctection plate
and conduit mounting
plate fit securely.
Conduit
mounting
plate
Conduit
Lock nut
18/24 class
[Method of mounting conduit]
1)
Dismount the service lid by removing the screws.
2)
Pass wires through the conduit and secure them with a lock nut.
3)
After completing the work, reattach the service lid to its original position.
SIG
Shape wires so that
the proctection plate
and conduit mounting
plate fit securely.
Lock nut
Conduit
Conduit mounting plate

ELECTRICAL WIRING CONNECTION

Power supply
terminal block
Power supply
terminal block
SIG
SIG
1-14
Protection plate
Screws
Conduit
mounting
cover
Screws
Service lid
Screws
Screws

Publicité

Table des Matières
loading

Table des Matières