ASSEMBLY
Step 15
15.1 Secure the left side of the roof finishing bar (I)
and a finishing end (Q) with a screw and nut (W1)
in the front left corner of the shelter as illustrated.
15.2 Place a roof finishing bar (I) next to the first roof
finishing bar (I) and align the pre-drilled holes
in each bar one on top of the other. Place a
finishing end (Q2) over the aligned holes and
secure with a screw and nut (W1) as illustrated.
15.3 Repeat this process with the remaining
roof finishing bars (I).
15.4 Secure the last corner with a finishing end (Q1),
a screw and a nut (W1) as illustrated.
Parts required for this step / Pièces requises pour cette étape :
Q
1
X
32
ASSEMBLAGE
Étape 15
15.1 Attacher le côté gauche de la barre de finition de
15.2 Placer une barre de finition de toit (I) à droite de
15.3 Répéter ce procédé avec les barres de finition de
15.4 Terminer l'installation dans le coin droit en utilisant
J1
J2
J
W1
Q2
6
X
I
7
X
© Sojag inc. 2015
toit (I) et un embout de finition (Q) dans le coin
avant gauche en utilisant une vis et écrou borgne (W1)
tel qu'illustré.
la première barre de finition de toit (I) et enligner les
trous les uns par-dessus les autres. Placer un embout
de finition (Q2) par-dessus les trous et les attacher avec
une vis et écrou borgne (W1) tel qu'illustré.
toit (I) restantes.
un embout de finition (Q1), une vis et écrou
borgne (W1) tel qu'illustré.
W1
W1
Q1
1
X
W1
8
X