Mounting instructions
Required tools:
- screw wrench 10
- screwdriver
- socket-head screw wrench 6mm
1. Place the back panel on the base and secure the click locks.
2. Mount the side panels by means of 6mm socket‑head screw wrench.
3. Mount the top panel on the back panel and both side panels, and secure by means of socket‑head screw
wrench (6mm).
4. Fix in the hinge pins into the underside of the top panels.
5. Next, place the middle post loose, and after having mounted the doors, adjust it and screw it tight.
6. Place the left and right door panels into upper hinge pins.
7. Adjust lower hinges, plug in the hinge pins from under and secure by means of screw wrench (M10).
8. The counter part of the latch has to be mounted on the doorpost with the screws supplied.
9. Place the cooling unit from top downwards through the opening in the top panel.
10. Melt water container: A. in cooler
B. or mounted at a side
11. After total assembly , close the holes with the caps supplied.
Piping for melt water to be constructed with U‑bends (stench‑trap), outside through opening either to the
left or the right and leading into the melt water container, or (as an option) into the melt water evaporation
basin.
The waste disposal cooler should be placed under a roof, when installed outside.
14